Mladenov Water Innovation and Reuse Lab
  • Home
  • Research
  • Publications
  • Teaching
  • People
    • Prospective Students
  • Contact
  • ENVE 647 Projects - Tijuana River Reuse
  • ENVE 445 Projects - Tijuana River Reuse

ENV E 445 WATER AND WASTEWATER TREATMENT
Tijuana River Water Reuse Facility
​FINAL PROJECTS
​Spring 2025

All teams designed an upgrade to the expanded 50 MGD International Wastewater Treatment Plant in which 20 MGD of the treated wastewater received advanced water purification with membrane filtration, reverse osmosis, and UV-disinfection (or advanced oxidation). Teams calculated the land area in Tijuana that could be irrigated with the reclaimed water to stabilize slopes, provide urban greening, and reduce erosion.
Videos summarizing each team's design are linked below:

Picture
Picture
Picture
Picture
Picture

Picture
Picture
Picture
Powered by Create your own unique website with customizable templates.
  • Home
  • Research
  • Publications
  • Teaching
  • People
    • Prospective Students
  • Contact
  • ENVE 647 Projects - Tijuana River Reuse
  • ENVE 445 Projects - Tijuana River Reuse